Our Installations

Choose an region to see customer installations from that region.

Copford Farm Sawmill

"In addition to being faster we are getting much higher yield from bigger logs."

Alex Gingell, Owner

Log Specs

up to 1.7m (67") diameter

Final Product

Joinery Timber, Quarter-sawn Furniture Material

Meblohit

"With the Wood-Mizer line, we have significantly increased efficiency without additional workers."

Jan Zawada, Owner

Log Specs

8.2ft (2.5m) long
5.9–17.7in (15–45cm) diameter

Final Product

Pallets

Production

Average: 178 ft3 (60→90 m3) per shift

Recovery

63%

Installation Time

6 Weeks

Manpower Required

3 People

Varming Village

The WM1000 gave this third-generation family sawmill the ability to cut logs up to 5' 7" (1.7m) wide, far beyond its previous capability. Processing extra-large diameter logs attracted new clients from across Denmark, transforming the local mill into a multi-service timber business serving joinery and furniture makers nationwide.

"With this machine, I can handle any order to cut logs. That's why I bought WM1000."

Thomas Lautrup Andersen, Owner

Log Specs

Up to 1.7m (67") diameter

Final Product

Joinery Timber, Furniture, Wide slabs, Fencing

Fagus

"The construction of the new facility was strictly connected with the purchase of the WB2000, and the solutions developed by the Wood-Mizer engineers resulted in the improvement of the overall process, and more significantly, decreasing the needs for the subsequent stages of production."

Mateusz Ziemiński, Co-owner

Final Product

Solid Wood furniture

Production

10-15% productivity boost

AMESKO

Replacing a 3-blade circular resaw with the HR250's twin-blade thin-kerf system significantly increased board yield per cant. Previously unrecoverable off-cuts can now be processed, reducing waste while also lowering energy and maintenance costs.

"We have noticed less energy consumption, less maintenance and training required compared to our old circular saw resaw."

Final Product

Pallets

Installation Time

2-4 hours (HR250 installation)

Novar Sawmill

The WB2000/EG300/LT70 setup meets full production demand while running just one to two days per week, demonstrating strong per-shift output efficiency. The EG300 contributes an estimated 20–30% productivity uplift, keeping this Scottish mill profitable with minimal machine hours.

"I've been thrilled with Wood-Mizer products and services. Keith Threadgall has always been very helpful, offering the best customer service whenever I needed it, including a swift installation of the WB2000 sawmill."

Ronald Munro Ferguson, Owner

Log Specs

logs up to 24.6ft (7.5m) long

Final Product

Cladding, structural beams, modular sheds, garden rooms

Production

1–2 days/week operation (meets full demand)

Manpower Required

7 total employees; 2 to operate WB2000

"passt.at" Carpentry Workshop

"This sawmill eliminates the need for outsourcing, saving both time and transportation costs."

Roman Franek, Owner

Log Specs

Up to 1.7m (67") diameter

Final Product

Custom slabs, countertops, benches, furniture

Get a Quote.

Let's optimize your operation.

The administrator of your personal data is Wood-Mizer Industries Sp. z o.o., based in Koło (62-600), ul. Nagórna 114. Your personal data is processed for commercial, marketing purposes and for responding to inquiries submitted through online forms. More information about the personal data processing and your rights can be found in the Privacy Policy.

© Copyright 2026 by Wood-Mizer Industries Sp. z o.o.